Browsing ยป Featured

Astoria Megler Bridge

Astoria Megler Bridge

Name: Astoria Megler Bridge
Location: Astoria, Oregon
Description: W.C.C.C awarded a 3 year coating inspection contract on the Astoria bridge by the Oregon Department of Transportation

City of Sunnyvale Public Works 3-5 Million Gallon Water Tanks

City of Sunnyvale Public Works 3-5 Million Gallon Water Tanks

Name: City of Sunnyvale Public Works 3-5 Million Gallon Water Tanks
Location: Sunnyvale, California
Description: W.C.C.C. provided coating inspection services.
Product Inspected – Sherwin Williams 3 coat system 1. zinc clad 2. tile clad 3. spraylastic acrylic.

Golden Gate Bridge Phase II Retrofit Coating Inspection, 2005-2006

Golden Gate Bridge Phase II Retrofit Coating Inspection, 2005-2006

Name: Golden Gate Bridge Phase II Retrofit Coating Inspection, 2005-2006 Location: San Francisco, California Description: West Coast Coating Consultants provided two N.A.C.E.-certified Coating Inspectors to verify coating specifications compliance by the painting contractor Long painting, Inc. of Kent, Washington. Product Inspected: Wasser High Tech Coatings

Oakland to San Francisco Bay Bridge Skyway Coating Inspection, 2007

Oakland to San Francisco Bay Bridge Skyway Coating Inspection, 2007

Name: Oakland to San Francisco Bay Bridge Skyway Project 2007
Location: Oakland, California
Description: W.C.C.C provided two N.A.C.E.-certified Coating Inspectors to verify coating specification compliance by the painting contractor F.D. Thomas, Inc. from Medford, Oregon.
Product Inspected: Carboline Coatings Company

Beale Air Force Base JP 8 Fuel Storage Tanks Coating Inspection, 2008

Beale Air Force Base JP 8 Fuel Storage Tanks Coating Inspection, 2008

Name: Beale Air Force Base, Coating Inspection of Two 1.5-million-gallon JP 8 Fuel Storage Tanks
Location: Beale AFB, California
Description: W.C.C.C. provided N.A.C.E.-certified Coating Inspectors to verify coating specification compliance by the industrial coating contractor Purcell Painting of Washington state.
Product Inspected: Sherwin Williams Epoxy Polyamide Type IV

Santa Clara Valley Water District Tank Coating Inspection, 2009

Santa Clara Valley Water District Tank Coating Inspection, 2009

Name: Santa Clara Valley Water District 3.5 million-gallon Regulating Tank Coating Inspection
Location: Pachaco Pumping Plant, San Luis Reservoir, California
Description: W.C.C.C. provided one N.A.C.E.-certified Coating Inspector for coating inspection services to verify coating specification compliance by two industrial coating contractors: Blastco, Inc. of Texas and F.D. Thomas of Medford, Oregon.
Products Inspected: Global EcoTechnologies 100% Solids Endura [...]